Every number on this site comes from something. Here is all of it in one place, plus an honest list of what we couldn’t confirm.

What “not verified” means here

Three different things get marked. A source we read at search-synthesis level rather than loading directly. A source we loaded but whose underlying study we didn’t trace. And a claim where the primary record was unreachable when we checked.

In all three cases the claim still appears on the site, because leaving it out would be its own kind of distortion. It appears with a Reported, not verified label attached, so you know what you’re looking at.

Open items

Things we know are missing or unconfirmed, as of August 12, 2026:

  1. Carroll News-Democrat / Madison Courier (Paxton Media Group). Record and link the direct URL for the July 23, 2026 DECA article.
  2. Carroll News-Democrat / Madison Courier (Paxton Media Group). Pull the Kentucky Attorney General opinion itself and link it, rather than relying on a news summary with no recorded URL.
  3. WKYT (Lexington). Record and link the direct WKYT article URL, and get a readable copy of the signed order.
  4. WUKY (public radio, Lexington). Record and link the direct WUKY article URL for the Stivers criticism.
  5. Commonwealth of Kentucky. Re-check governor.ky.gov and the Secretary of State executive order registry, then either confirm the order number 2026-494 against the signed order or remove the number from the site.
  6. Environmental and Energy Study Institute (EESI). Trace each decibel figure back to the study or news report EESI credits it to, and cite that instead.
  7. Congressional Research Service. Read CRS R48646 directly and re-check every water figure against it.
  8. George Mason University, Schar School of Policy and Government. Load the GMU release and the underlying study, then restate the finding precisely.
  9. Bisnow. Load the Bisnow piece directly and identify each study it summarizes, including the University of Rochester work and the second George Mason study that reaches the opposite conclusion.
  10. Kittelson & Associates. Load the Kittelson piece directly or replace it with a public agency traffic guidance document.
  11. Carroll County zoning status. Find a second, independent outlet, or confirm directly with the county planning office. The claim currently rests on two articles from one media company.
  12. Carroll County population. Verify the current five-year American Community Survey figure, which determines which tax exemption tier a project falls in.
  13. Indianapolis moratorium. Our sources covered it only at committee stage, with a full council vote scheduled for August 10, 2026. Not currently cited on the site for that reason.
  14. Louisville moratorium. The mayor called for one on August 4, 2026. We haven’t loaded that story directly, so it isn’t cited.

How advocacy and industry sources are handled

They get used, and they get labeled. When a claim comes from a group that advocates for a position, from an industry trade group, or from a developer, the label sits next to the claim, not buried in a footnote. Developer-commissioned job and revenue projections say “developer-commissioned” every single time they appear.

Every citation, by page

How to fight a data center: a practical local action plan

  1. Atlanta News First

    Lovejoy data center proposal withdrawn after community pushback

    August 8, 2026. Accessed August 12, 2026.

    https://www.atlantanewsfirst.com/2026/08/09/lovejoy-data-center-proposal-withdrawn-after-community-pushback/

    Local reporting that the developer withdrew a proposed Lovejoy, Georgia data center after vocal resident opposition and pivoted the site to a residential plan.

  2. FOX 5 Atlanta

    Douglas County leaders just killed a massive data center project

    July 8, 2026. Accessed August 12, 2026.

    https://www.fox5atlanta.com/news/douglas-county-leaders-just-killed-massive-data-center-project

    Local reporting on a four-to-one county commission vote denying rezoning after a public hearing where neighbors used visual props and sound examples.

  3. Capital B Atlanta

    DeKalb Rejects Data Center Regulations, Leaving Future Expansion Uncertain

    July 1, 2026. Accessed August 12, 2026.

    https://atlanta.capitalbnews.org/dekalb-data-centers-commissioners/

    Local nonprofit reporting on resident organizing, public comments, a moratorium, and the county commission's rejection of a proposed data-center zoning amendment. The article also explains why organizers did not view that vote as a final outcome.

  4. Kentucky Public Radio / Louisville Public Media

    A Kentucky county passes a data center moratorium — with a city-sized hole

    August 12, 2026. Accessed August 12, 2026.

    https://www.lpm.org/news/2026-08-12/a-kentucky-county-passes-a-data-center-moratorium-with-a-city-sized-hole

    Public-media reporting on Mercer County's unanimous one-year moratorium and the meetings, open-records work, visible group identity, and sustained attendance surrounding the local campaign.

Who to contact and how to participate

  1. USAGov

    Local governments

    Current. Accessed August 12, 2026.

    https://www.usa.gov/local-governments

    Official state-by-state directory for finding county, city, town, and other local government contacts.

  2. U.S. Environmental Protection Agency

    Health and Environmental Agencies of U.S. States and Territories

    Updated July 20, 2026. Accessed August 12, 2026.

    https://www.epa.gov/aboutepa/health-and-environmental-agencies-us-states-and-territories

    Official nationwide directory linking the environmental and health agencies in every state and territory.

  3. U.S. Environmental Protection Agency

    EPA Permitting Authority Map

    Current. Accessed August 12, 2026.

    https://www.epa.gov/permits/epa-permitting-authority-map

    Official map for identifying whether an EPA, state, tribal, or local agency administers a federal environmental permitting program.

  4. National Association of Regulatory Utility Commissioners

    State, associate, and federal members

    Current. Accessed August 12, 2026.

    https://www.naruc.org/about-naruc/our-mission/state-associate-and-federal-members/

    NARUC is the national association representing state public-service and utility commissioners.

    Nationwide list of the public commission that regulates utilities in each state and the District of Columbia.

  5. USAGov

    Find and contact elected officials

    Updated March 2, 2026. Accessed August 12, 2026.

    https://www.usa.gov/elected-officials

    Official federal directory for finding federal, state, county, and municipal representatives and their current contact information.

  6. National Freedom of Information Coalition

    State and regional affiliates

    Current. Accessed August 12, 2026.

    https://www.nfoic.org/members/

    NFOIC is a nonprofit coalition that advocates for open government and public access to records.

    Nationwide directory of state and regional organizations that help people understand public-records and open-meetings processes.

  7. U.S. Environmental Protection Agency

    Participate in the Title V permitting process

    Current. Accessed August 12, 2026.

    https://www.epa.gov/title-v-operating-permits/participate-permitting-process

    Official guidance on reviewing draft operating permits, submitting comments, requesting a hearing, monitoring compliance, and petitioning EPA.

  8. U.S. Environmental Protection Agency

    Participate in the New Source Review permitting process

    Current. Accessed August 12, 2026.

    https://www.epa.gov/nsr/participate-permitting-process

    Official guidance on public notices, comments, hearings, and preserving issues in an air-permit record.

  9. American Civil Liberties Union

    Protesters’ Rights

    Updated June 8, 2026. Accessed August 12, 2026.

    https://www.aclu.org/know-your-rights/protesters-rights

    The ACLU is a civil-liberties advocacy organization. This is general rights education, not project-specific legal advice.

    Current general guide to speech, assembly, photography, dispersal orders, and encounters with police. Local permits and rules still vary.

Data center resources for every state

  1. USAGov

    Local governments

    Current. Accessed August 12, 2026.

    https://www.usa.gov/local-governments

    Official state-by-state directory for finding county, city, town, and other local government contacts.

  2. U.S. Environmental Protection Agency

    Health and Environmental Agencies of U.S. States and Territories

    Updated July 20, 2026. Accessed August 12, 2026.

    https://www.epa.gov/aboutepa/health-and-environmental-agencies-us-states-and-territories

    Official nationwide directory linking the environmental and health agencies in every state and territory.

  3. National Association of Regulatory Utility Commissioners

    State, associate, and federal members

    Current. Accessed August 12, 2026.

    https://www.naruc.org/about-naruc/our-mission/state-associate-and-federal-members/

    NARUC is the national association representing state public-service and utility commissioners.

    Nationwide list of the public commission that regulates utilities in each state and the District of Columbia.

  4. USAGov

    Find and contact elected officials

    Updated March 2, 2026. Accessed August 12, 2026.

    https://www.usa.gov/elected-officials

    Official federal directory for finding federal, state, county, and municipal representatives and their current contact information.

  5. National Freedom of Information Coalition

    State and regional affiliates

    Current. Accessed August 12, 2026.

    https://www.nfoic.org/members/

    NFOIC is a nonprofit coalition that advocates for open government and public access to records.

    Nationwide directory of state and regional organizations that help people understand public-records and open-meetings processes.

Noise

  1. Kentucky Energy Planning and Inventory Commission (EPIC)

    EPIC Report No. 2026-001, “Data Centers in Kentucky: Policy Analysis for the General Assembly”

    June 2026. Accessed August 12, 2026.

    https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf

    State commission report prepared for the General Assembly under KRS 164.2807. Hosted on the University of Kentucky CAER website, but it is not a UK study. Full 20-page text read directly. Its own disclaimer says it “does not constitute a formal recommendation or position of any state agency, utility, or regulated entity.”

  2. Environmental and Energy Study Institute (EESI)not verified

    Communities Are Raising Noise Pollution Concerns About Data Centers

    Undated. Accessed August 12, 2026.

    https://www.eesi.org/articles/view/communities-are-raising-noise-pollution-concernsabout-data-centers

    EESI is a nonprofit that advocates for environmental and clean energy policy. Its framing is advocacy. The decibel figures inside the piece are attributed to reporting and studies it cites, not measured by EESI.

    Our source pass read this at search-synthesis level and did not re-verify it against the underlying studies.

Water

  1. Congressional Research Servicenot verified

    Report R48646, on data center resource use

    2025. Accessed August 12, 2026.

    https://www.congress.gov/crs-product/R48646

    Nonpartisan research arm of Congress. The full text returned HTTP 403 in our source pass. The water figures on this site come from a search synthesis that credits this report and others, not from a direct read.

  2. Carroll News-Democrat / Madison Courier (Paxton Media Group)

    Carrollton reaches agreement for $9.6B data center

    July 29, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/news/carrollton-reaches-agreement-for-9-6b-data-center/article_f616dd07-b3b7-53dd-a9e8-4824c9263043.html

    Local newspaper. The only outlet reporting several Carroll County details on this site. Paxton Media Group owns both mastheads, so a second Paxton article is not an independent confirmation.

  3. WKYU (public radio, Bowling Green)

    Kentucky Gov. Beshear to require data centers prove no impact on ratepayers

    August 6, 2026. Accessed August 12, 2026.

    https://www.wkyufm.org/2026-08-06/kentucky-gov-beshear-to-require-data-centers-prove-no-impact-on-ratepayers

    Public radio. Loaded directly. Primary source used for the executive order’s provisions.

Power and the grid

  1. Kentucky Energy Planning and Inventory Commission (EPIC)

    EPIC Report No. 2026-001, “Data Centers in Kentucky: Policy Analysis for the General Assembly”

    June 2026. Accessed August 12, 2026.

    https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf

    State commission report prepared for the General Assembly under KRS 164.2807. Hosted on the University of Kentucky CAER website, but it is not a UK study. Full 20-page text read directly. Its own disclaimer says it “does not constitute a formal recommendation or position of any state agency, utility, or regulated entity.”

Kentucky Data Center Tax Exemption (KRS 139.499)

  1. Kentucky Revised Statutes

    KRS 139.499, Exemption for certain data center equipment

    Effective July 15, 2024. Accessed August 12, 2026.

    https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=55425

    Primary statute text, read directly.

  2. Kentucky Revised Statutes

    KRS 154.20-220, definitions including “qualified data center project” and “term”

    Effective June 27, 2025. Accessed August 12, 2026.

    https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=56356

    Primary statute text, read directly. This is where the dollar thresholds and the length of the exemption actually live, not in KRS 139.499.

  3. Stites & Harbison PLLC

    Kentucky vastly expands data center tax incentives

    2025. Accessed August 12, 2026.

    https://www.stites.com/resources/client-alerts/kentucky-vastly-expands-data-center-tax-incentives/

    Law firm client alert, written for business clients. Useful plain-English summary, but it says “up to 50 years” without the shorter tiers, so this site cites the statute for every number instead.

  4. WKYU (public radio, Bowling Green)

    Kentucky Gov. Beshear to require data centers prove no impact on ratepayers

    August 6, 2026. Accessed August 12, 2026.

    https://www.wkyufm.org/2026-08-06/kentucky-gov-beshear-to-require-data-centers-prove-no-impact-on-ratepayers

    Public radio. Loaded directly. Primary source used for the executive order’s provisions.

  5. Kentucky Energy Planning and Inventory Commission (EPIC)

    EPIC Report No. 2026-001, “Data Centers in Kentucky: Policy Analysis for the General Assembly”

    June 2026. Accessed August 12, 2026.

    https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf

    State commission report prepared for the General Assembly under KRS 164.2807. Hosted on the University of Kentucky CAER website, but it is not a UK study. Full 20-page text read directly. Its own disclaimer says it “does not constitute a formal recommendation or position of any state agency, utility, or regulated entity.”

Property values

  1. George Mason University, Schar School of Policy and Governmentnot verified

    Study: Home prices are higher when a house is near a data center

    November 2025. Accessed August 12, 2026.

    https://schar.gmu.edu/news/2025-11/study-home-prices-are-higher-when-house-near-data-center

    University news release about its own study. Read at search-synthesis level in our source pass, not loaded directly, so no methodology claims are made here.

  2. Bisnownot verified

    Data centers may not be a drag on nearby home prices

    2025. Accessed August 12, 2026.

    https://www.bisnow.com/national/news/data-center-community-relations/data-centers-may-not-be-a-drag-on-nearby-home-prices-135084

    Commercial real estate trade publication, so its readership is the industry. Read at search-synthesis level, not loaded directly.

  3. Carroll News-Democrat / Madison Courier (Paxton Media Group)

    Carrollton reaches agreement for $9.6B data center

    July 29, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/news/carrollton-reaches-agreement-for-9-6b-data-center/article_f616dd07-b3b7-53dd-a9e8-4824c9263043.html

    Local newspaper. The only outlet reporting several Carroll County details on this site. Paxton Media Group owns both mastheads, so a second Paxton article is not an independent confirmation.

Construction traffic

  1. Louisiana Illuminator, reporting by Drew Hawkins of the Gulf States Newsroom

    Crashes spike around Meta data center construction

    November 22, 2025. Accessed August 12, 2026.

    https://lailluminator.com/2025/11/22/meta-data-center-crashes/

    Nonprofit news outlet. Loaded directly, in full. NPR published the same reporting by the same reporter four days later, so the NPR version is a redistribution, not an independent confirmation.

  2. NPR, reporting by Drew Hawkins of the Gulf States Newsroom

    Construction of Meta data center causing dangerous and reckless road conditions

    November 26, 2025. Accessed August 12, 2026.

    https://www.npr.org/2025/11/26/nx-s1-5613755/construction-of-meta-data-center-causing-dangerous-and-reckless-road-conditions

    Loaded directly. Same reporter and same newsroom as the Louisiana Illuminator story above. Listed for completeness, not as corroboration.

  3. Carroll News-Democrat / Madison Courier (Paxton Media Group)

    Carrollton reaches agreement for $9.6B data center

    July 29, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/news/carrollton-reaches-agreement-for-9-6b-data-center/article_f616dd07-b3b7-53dd-a9e8-4824c9263043.html

    Local newspaper. The only outlet reporting several Carroll County details on this site. Paxton Media Group owns both mastheads, so a second Paxton article is not an independent confirmation.

  4. Kittelson & Associatesnot verified

    Why data centers don’t fit standard traffic assumptions, and how to plan for their transportation impacts

    Undated. Accessed August 12, 2026.

    https://www.kittelson.com/ideas/why-data-centers-dont-fit-standard-traffic-assumptions-and-how-to-plan-for-their-transportation-impacts/

    Transportation engineering consultancy, so it sells this kind of study. Read at search-snippet level, not loaded directly.

Zoning and hearings

  1. Kentucky Association of Counties

    Planning and Zoning 101 for Counties

    Undated article, figures given as of 2025. Accessed August 12, 2026.

    https://kaco.org/articles/planning-and-zoning-101-for-counties/

    Membership association for Kentucky county governments. Loaded directly.

  2. Kentucky Revised Statutes

    KRS Chapter 100, Planning and Zoning

    Current. Accessed August 12, 2026.

    https://apps.legislature.ky.gov/law/statutes/chapter.aspx?id=37663

    Linked as the statute of record. Our source pass did not read the individual subsections, so this site does not state notice periods, appeal paths, or hearing triggers from it.

  3. WKYU (public radio, Bowling Green)

    Kentucky Gov. Beshear to require data centers prove no impact on ratepayers

    August 6, 2026. Accessed August 12, 2026.

    https://www.wkyufm.org/2026-08-06/kentucky-gov-beshear-to-require-data-centers-prove-no-impact-on-ratepayers

    Public radio. Loaded directly. Primary source used for the executive order’s provisions.

  4. Kentucky Energy Planning and Inventory Commission (EPIC)

    EPIC Report No. 2026-001, “Data Centers in Kentucky: Policy Analysis for the General Assembly”

    June 2026. Accessed August 12, 2026.

    https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf

    State commission report prepared for the General Assembly under KRS 164.2807. Hosted on the University of Kentucky CAER website, but it is not a UK study. Full 20-page text read directly. Its own disclaimer says it “does not constitute a formal recommendation or position of any state agency, utility, or regulated entity.”

  5. Virginia Legislative Information System

    HB 1515 (2026), data center siting and interconnection

    Continued to 2027 on February 6, 2026. Accessed August 12, 2026.

    https://lis.virginia.gov/bill-details/20261/HB1515

    Primary legislative record, read directly through a browser.

  6. Georgia Municipal Association bill tracker

    HB 1012 (2026), data center permit moratorium

    Introduced January 16, 2026. Accessed August 12, 2026.

    https://billtracker.gacities.com/legislation/72319

    Association of Georgia city governments. Used for bill status only. The Georgia General Assembly adjourned sine die in early April 2026, which ends bills still in committee.

  7. Carroll News-Democrat / Madison Courier (Paxton Media Group)not verified

    DECA proposing $4B data center in Carroll County

    July 23, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/

    Direct article URL was not recorded in our source pass, so the link goes to the outlet’s Carroll County section. Same owner as the July 29 story above. Treat both as one outlet.

Kentucky data center case study

  1. WDRB (Louisville)

    Louisville-based development team announces plans for $9.6B data center campus in Carroll County

    2026. Accessed August 12, 2026.

    https://www.wdrb.com/news/business/louisville-based-development-team-announces-plans-for-9-6b-data-center-campus-in-carroll-county/article_fbadd4b9-3df3-4a85-8e1c-ed98165aec07.html

    Television news station.

  2. Carroll News-Democrat / Madison Courier (Paxton Media Group)

    Carrollton reaches agreement for $9.6B data center

    July 29, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/news/carrollton-reaches-agreement-for-9-6b-data-center/article_f616dd07-b3b7-53dd-a9e8-4824c9263043.html

    Local newspaper. The only outlet reporting several Carroll County details on this site. Paxton Media Group owns both mastheads, so a second Paxton article is not an independent confirmation.

  3. Carroll News-Democrat / Madison Courier (Paxton Media Group)not verified

    DECA proposing $4B data center in Carroll County

    July 23, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/

    Direct article URL was not recorded in our source pass, so the link goes to the outlet’s Carroll County section. Same owner as the July 29 story above. Treat both as one outlet.

  4. Kentucky Energy Planning and Inventory Commission (EPIC)

    EPIC Report No. 2026-001, “Data Centers in Kentucky: Policy Analysis for the General Assembly”

    June 2026. Accessed August 12, 2026.

    https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf

    State commission report prepared for the General Assembly under KRS 164.2807. Hosted on the University of Kentucky CAER website, but it is not a UK study. Full 20-page text read directly. Its own disclaimer says it “does not constitute a formal recommendation or position of any state agency, utility, or regulated entity.”

  5. Kentucky Association of Counties

    Planning and Zoning 101 for Counties

    Undated article, figures given as of 2025. Accessed August 12, 2026.

    https://kaco.org/articles/planning-and-zoning-101-for-counties/

    Membership association for Kentucky county governments. Loaded directly.

  6. WKYU (public radio, Bowling Green)

    Kentucky Gov. Beshear to require data centers prove no impact on ratepayers

    August 6, 2026. Accessed August 12, 2026.

    https://www.wkyufm.org/2026-08-06/kentucky-gov-beshear-to-require-data-centers-prove-no-impact-on-ratepayers

    Public radio. Loaded directly. Primary source used for the executive order’s provisions.

  7. Washington Examiner

    Andy Beshear Kentucky data center executive order

    August 6, 2026. Accessed August 12, 2026.

    https://www.washingtonexaminer.com/policy/energy-and-environment/4678258/andy-beshear-kentucky-data-center-executive-order-latest-governor-crackdown/

    National outlet with a conservative editorial line. Used here only as one of the two outlets that printed the order number.

  8. WKYT (Lexington)not verified

    Coverage of the August 6, 2026 data center executive order

    August 6, 2026. Accessed August 12, 2026.

    https://www.wkyt.com/

    Television news station. Direct article URL was not recorded in our source pass, so the link goes to the station homepage. WKYT posted what appears to be the signed order to Scribd under the filename “20260806 Executive Order 2026 494 Related to Data Centers,” but that upload is set to private and cannot be read.

  9. Commonwealth of Kentuckynot verified

    Office of the Governor, and the Secretary of State executive order registry

    Checked August 6, 2026. Accessed August 12, 2026.

    https://apps.sos.ky.gov/executivejournal/

    This is the primary record that would confirm the order’s number. On August 6, 2026 the Secretary of State registry returned HTTP 403 to every request we made, and governor.ky.gov returned 403 as well, so we could not read the order itself. That is why the number on this site is attributed to news outlets instead of stated as fact.

  10. WUKY (public radio, Lexington)not verified

    Coverage of the August 6, 2026 data center executive order

    August 6, 2026. Accessed August 12, 2026.

    https://www.wuky.org/

    Public radio. Direct article URL was not recorded in our source pass, so the link goes to the station homepage.

  11. Kentucky Lantern

    Some Kentucky counties and cities are hitting pause on data centers

    June 8, 2026, by Liam Niemeyer. Accessed August 12, 2026.

    https://kentuckylantern.com/2026/06/08/some-kentucky-counties-and-cities-are-hitting-pause-on-data-centers/

    Nonprofit statehouse news outlet. Loaded directly.

  12. Kentucky Revised Statutes

    KRS 139.499, Exemption for certain data center equipment

    Effective July 15, 2024. Accessed August 12, 2026.

    https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=55425

    Primary statute text, read directly.

  13. Kentucky Revised Statutes

    KRS 154.20-220, definitions including “qualified data center project” and “term”

    Effective June 27, 2025. Accessed August 12, 2026.

    https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=56356

    Primary statute text, read directly. This is where the dollar thresholds and the length of the exemption actually live, not in KRS 139.499.

  14. Carroll News-Democrat / Madison Courier (Paxton Media Group)not verified

    Data centers qualify as industrial buildings, Attorney General says

    September 15, 2025. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/

    Direct article URL was not recorded in our source pass, so the link goes to the outlet’s Carroll County section. The underlying Kentucky Attorney General opinion has not been read directly.

Write a public comment

  1. Louisiana Illuminator, reporting by Drew Hawkins of the Gulf States Newsroom

    Crashes spike around Meta data center construction

    November 22, 2025. Accessed August 12, 2026.

    https://lailluminator.com/2025/11/22/meta-data-center-crashes/

    Nonprofit news outlet. Loaded directly, in full. NPR published the same reporting by the same reporter four days later, so the NPR version is a redistribution, not an independent confirmation.

U.S. data center project tracker

  1. Carroll News-Democrat / Madison Courier (Paxton Media Group)

    Carrollton reaches agreement for $9.6B data center

    July 29, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/news/carrollton-reaches-agreement-for-9-6b-data-center/article_f616dd07-b3b7-53dd-a9e8-4824c9263043.html

    Local newspaper. The only outlet reporting several Carroll County details on this site. Paxton Media Group owns both mastheads, so a second Paxton article is not an independent confirmation.

  2. Carroll News-Democrat / Madison Courier (Paxton Media Group)not verified

    DECA proposing $4B data center in Carroll County

    July 23, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/

    Direct article URL was not recorded in our source pass, so the link goes to the outlet’s Carroll County section. Same owner as the July 29 story above. Treat both as one outlet.

  3. Meta

    Teachers and Local Businesses Win as Meta Expands Louisiana Data Center

    July 20, 2026. Accessed August 12, 2026.

    https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/

    Meta is the project owner. Investment, capacity, job, and community-benefit claims on this page are the company’s own claims.

    Primary company update confirming the Richland Parish expansion to 5 GW and more than $50 billion of announced investment.

  4. North Carolina Department of Commerce

    Governor Stein Announces Amazon Plans to Invest $10 Billion in North Carolina for AI Infrastructure

    June 4, 2025. Accessed August 12, 2026.

    https://www.commerce.nc.gov/news/press-releases/2025/06/04/governor-stein-announces-amazon-plans-invest-10-billion-north-carolina-ai-infrastructure

    State economic-development announcement produced to promote the investment. Its investment and job figures originate with Amazon and the state.

    Official state announcement identifying Richmond County and the planned investment.

  5. North Carolina Department of Environmental Quality

    Joint public hearing on Amazon data center and Duke Energy air quality permits in Richmond County

    June 26, 2026. Accessed August 12, 2026.

    https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond

    Primary state permitting notice identifying the Energy Way Tech Campus, its bridge-power proposal, emergency generators, hearing, and comment deadline.

  6. Commonwealth of Pennsylvania

    Amazon plans to invest $20 billion in Pennsylvania for AI infrastructure

    June 9, 2025. Accessed August 12, 2026.

    https://www.pa.gov/governor/newsroom/2025-press-releases/gov-announces-amazon-to-invest--20b-in-pa--largest-capital-inves

    State economic-development announcement produced to promote the investment. The $20 billion figure covers multiple Pennsylvania campuses, not Falls Township alone.

    Official state announcement naming Falls Township and Salem Township as the first sites.

  7. Pennsylvania Department of Environmental Protection

    Community meeting on proposed air quality permit for Amazon Data Center in Falls Township

    July 13, 2026. Accessed August 12, 2026.

    https://www.pa.gov/agencies/dep/newsroom/2026-07-13-dep-to-host-community-meeting-on-proposed-air-quality-permit-for-amazon-data-center-bucks-county

    Primary state permitting update for the Keystone Trade Center site and its proposed backup-generation plan.

  8. Indiana Economic Development Corporation

    Groundbreaking for Meta data center campus at LEAP District

    February 11, 2026. Accessed August 12, 2026.

    https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district

    State economic-development announcement produced with Meta. Investment and employment projections are company and state claims.

    Official state account of the groundbreaking, planned campus scale, phases, jobs, and tax exemption.

  9. Meta Data Centers

    Hello, Cheyenne!

    July 2, 2024. Accessed August 12, 2026.

    https://datacenters.atmeta.com/2024/07/hello-cheyenne/

    Meta is the project owner. Investment, size, and employment figures are the company’s own projections.

    Primary company announcement for the Cheyenne campus.

  10. OpenAI

    OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites

    September 23, 2025. Accessed August 12, 2026.

    https://openai.com/index/five-new-stargate-sites/

    OpenAI is a principal project partner. Capacity and investment totals are company announcements covering multiple Stargate sites.

    Primary company update describing the operating Abilene flagship and announced sites in New Mexico, Ohio, Texas, and the Midwest. Combined capacity and investment figures must not be treated as site-specific totals.

  11. Microsoft

    Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin

    June 23, 2026. Accessed August 12, 2026.

    https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/

    Microsoft is the project owner. Investment and employment figures are the company’s own account.

    Primary company update confirming the first facility is operational and a second is under construction.

  12. South Carolina Department of Commerce

    Meta selects Aiken County for first South Carolina data center

    August 29, 2024. Accessed August 12, 2026.

    https://www.sccommerce.com/ja/node/8034

    State economic-development announcement produced with Meta. Investment, jobs, and opening date are projections.

    Official state announcement identifying the Sage Mill Industrial Park site and expected spring 2027 opening.

  13. Arkansas Economic Development Commission

    Google locating new data center in West Memphis with multi-billion-dollar investment

    October 2, 2025. Accessed August 12, 2026.

    https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment

    State economic-development announcement produced with Google. Investment, employment, energy, and ratepayer claims are the state and company’s account.

    Official state announcement confirming construction, the West Memphis location, site acreage, and announced energy arrangements.

  14. Meta Data Centers

    Hello, Montgomery!

    May 2, 2024. Accessed August 12, 2026.

    https://datacenters.atmeta.com/2024/05/hello-montgomery/

    Meta is the project owner. Investment, size, employment, energy, and sustainability statements are the company’s own claims.

    Primary company announcement identifying the Montgomery campus and documenting construction activity and planned scale.

  15. Meta Data Centers

    United States data center locations: Rosemount

    Current location directory checked August 2026. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the project owner. Investment, jobs, and construction milestones are the company’s own account.

    Primary company location directory listing the Rosemount project, its 2024 groundbreaking, and announced investment.

  16. Office of the Governor of Mississippi

    Amazon continues Mississippi expansion

    April 9, 2026. Accessed August 12, 2026.

    https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/

    State economic-development announcement produced to promote Amazon’s investment. Investment and job figures are state and company projections.

    Official state announcement identifying an additional Madison County expansion of existing Amazon data center operations.

  17. Meta

    Breaking ground on a new AI-optimized data center in Tulsa, Oklahoma

    April 21, 2026. Accessed August 12, 2026.

    https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/

    Meta is the project owner. Investment, employment, water, energy, and community-benefit statements are the company’s own claims.

    Primary company announcement confirming the Tulsa groundbreaking and announced project scale.

  18. Maryland Department of the Environment

    Frederick Data Center Sampling and Reports

    Updated through 2026. Accessed August 12, 2026.

    https://mde.maryland.gov/datacenters/Pages/FrederickDataCenter.aspx

    Primary state record identifying the Quantum Frederick site, individual developers, environmental conditions, and permit documents.

  19. Louisa County, Virginia

    Amazon Web Services announces plan to invest in Louisa County

    August 30, 2023. Accessed August 12, 2026.

    https://louisacounty.gov/m/newsflash/home/detail/446

    County economic-development announcement produced with AWS. Investment, employment, tax, and community-benefit statements are county and company projections.

    Official county announcement identifying two planned AWS campuses and the county technology overlay district.

  20. Meta

    Meta announces new strategic venture with BlackRock to develop data center in El Paso

    July 28, 2026. Accessed August 12, 2026.

    https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/

    Meta is the project owner and initial sole occupant. Investment, capacity, employment, and schedule statements are the company’s own account.

    Primary current company update confirming construction, announced capacity, financing structure, and target for bringing capacity online.

  21. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

  22. City of Cheyenne

    Data Centers: local projects, utilities, water, and planning

    Updated through May 2026. Accessed August 12, 2026.

    https://www.cheyennecity.org/Your-Government/Departments/Planning-and-Development-Department/Data-Centers

    Primary city resource with counts and a map of operating, under-construction, and proposed projects. It identifies Meta in the High Plains Business Park.

  23. OpenAI

    Building the compute infrastructure for the Intelligence Age

    April 29, 2026. Accessed August 12, 2026.

    https://openai.com/index/building-the-compute-infrastructure-for-the-intelligence-age/

    OpenAI is a principal user and partner in Stargate. Water and community-benefit statements are the company’s own account.

    Primary company update confirming that the Abilene site is operating on Oracle Cloud Infrastructure.

  24. Frederick County, Maryland

    Data Centers

    Updated July 2026. Accessed August 12, 2026.

    https://frederickcountymd.gov/9310/Data-Centers

    Primary county hub documenting current construction, the temporary pause on new applications, project maps, road notices, and local concern contacts.

  25. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

How to track a data center project

  1. USAGov

    Local governments

    Current. Accessed August 12, 2026.

    https://www.usa.gov/local-governments

    Official state-by-state directory for finding county, city, town, and other local government contacts.

  2. USAGov

    Find and contact elected officials

    Updated March 2, 2026. Accessed August 12, 2026.

    https://www.usa.gov/elected-officials

    Official federal directory for finding federal, state, county, and municipal representatives and their current contact information.

  3. U.S. Environmental Protection Agency

    Health and Environmental Agencies of U.S. States and Territories

    Updated July 20, 2026. Accessed August 12, 2026.

    https://www.epa.gov/aboutepa/health-and-environmental-agencies-us-states-and-territories

    Official nationwide directory linking the environmental and health agencies in every state and territory.

  4. U.S. Environmental Protection Agency

    EPA Permitting Authority Map

    Current. Accessed August 12, 2026.

    https://www.epa.gov/permits/epa-permitting-authority-map

    Official map for identifying whether an EPA, state, tribal, or local agency administers a federal environmental permitting program.

  5. National Association of Regulatory Utility Commissioners

    State, associate, and federal members

    Current. Accessed August 12, 2026.

    https://www.naruc.org/about-naruc/our-mission/state-associate-and-federal-members/

    NARUC is the national association representing state public-service and utility commissioners.

    Nationwide list of the public commission that regulates utilities in each state and the District of Columbia.

Carrollton Poe / PowerHouse campus tracker

  1. Carroll News-Democrat / Madison Courier (Paxton Media Group)

    Carrollton reaches agreement for $9.6B data center

    July 29, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/news/carrollton-reaches-agreement-for-9-6b-data-center/article_f616dd07-b3b7-53dd-a9e8-4824c9263043.html

    Local newspaper. The only outlet reporting several Carroll County details on this site. Paxton Media Group owns both mastheads, so a second Paxton article is not an independent confirmation.

  2. WDRB (Louisville)

    Louisville-based development team announces plans for $9.6B data center campus in Carroll County

    2026. Accessed August 12, 2026.

    https://www.wdrb.com/news/business/louisville-based-development-team-announces-plans-for-9-6b-data-center-campus-in-carroll-county/article_fbadd4b9-3df3-4a85-8e1c-ed98165aec07.html

    Television news station.

DECA Carroll County project tracker

  1. Carroll News-Democrat / Madison Courier (Paxton Media Group)not verified

    DECA proposing $4B data center in Carroll County

    July 23, 2026. Accessed August 12, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/

    Direct article URL was not recorded in our source pass, so the link goes to the outlet’s Carroll County section. Same owner as the July 29 story above. Treat both as one outlet.

Meta Hyperion tracker

  1. Meta

    Teachers and Local Businesses Win as Meta Expands Louisiana Data Center

    July 20, 2026. Accessed August 12, 2026.

    https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/

    Meta is the project owner. Investment, capacity, job, and community-benefit claims on this page are the company’s own claims.

    Primary company update confirming the Richland Parish expansion to 5 GW and more than $50 billion of announced investment.

  2. Louisiana Illuminator, reporting by Drew Hawkins of the Gulf States Newsroom

    Crashes spike around Meta data center construction

    November 22, 2025. Accessed August 12, 2026.

    https://lailluminator.com/2025/11/22/meta-data-center-crashes/

    Nonprofit news outlet. Loaded directly, in full. NPR published the same reporting by the same reporter four days later, so the NPR version is a redistribution, not an independent confirmation.

Amazon Energy Way Tech Campus tracker

  1. North Carolina Department of Commerce

    Governor Stein Announces Amazon Plans to Invest $10 Billion in North Carolina for AI Infrastructure

    June 4, 2025. Accessed August 12, 2026.

    https://www.commerce.nc.gov/news/press-releases/2025/06/04/governor-stein-announces-amazon-plans-invest-10-billion-north-carolina-ai-infrastructure

    State economic-development announcement produced to promote the investment. Its investment and job figures originate with Amazon and the state.

    Official state announcement identifying Richmond County and the planned investment.

  2. North Carolina Department of Environmental Quality

    Joint public hearing on Amazon data center and Duke Energy air quality permits in Richmond County

    June 26, 2026. Accessed August 12, 2026.

    https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond

    Primary state permitting notice identifying the Energy Way Tech Campus, its bridge-power proposal, emergency generators, hearing, and comment deadline.

Amazon Falls Township campus tracker

  1. Commonwealth of Pennsylvania

    Amazon plans to invest $20 billion in Pennsylvania for AI infrastructure

    June 9, 2025. Accessed August 12, 2026.

    https://www.pa.gov/governor/newsroom/2025-press-releases/gov-announces-amazon-to-invest--20b-in-pa--largest-capital-inves

    State economic-development announcement produced to promote the investment. The $20 billion figure covers multiple Pennsylvania campuses, not Falls Township alone.

    Official state announcement naming Falls Township and Salem Township as the first sites.

  2. Pennsylvania Department of Environmental Protection

    Community meeting on proposed air quality permit for Amazon Data Center in Falls Township

    July 13, 2026. Accessed August 12, 2026.

    https://www.pa.gov/agencies/dep/newsroom/2026-07-13-dep-to-host-community-meeting-on-proposed-air-quality-permit-for-amazon-data-center-bucks-county

    Primary state permitting update for the Keystone Trade Center site and its proposed backup-generation plan.

Meta LEAP campus tracker

  1. Indiana Economic Development Corporation

    Groundbreaking for Meta data center campus at LEAP District

    February 11, 2026. Accessed August 12, 2026.

    https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district

    State economic-development announcement produced with Meta. Investment and employment projections are company and state claims.

    Official state account of the groundbreaking, planned campus scale, phases, jobs, and tax exemption.

Meta Cheyenne Data Center tracker

  1. Meta Data Centers

    Hello, Cheyenne!

    July 2, 2024. Accessed August 12, 2026.

    https://datacenters.atmeta.com/2024/07/hello-cheyenne/

    Meta is the project owner. Investment, size, and employment figures are the company’s own projections.

    Primary company announcement for the Cheyenne campus.

  2. City of Cheyenne

    Data Centers: local projects, utilities, water, and planning

    Updated through May 2026. Accessed August 12, 2026.

    https://www.cheyennecity.org/Your-Government/Departments/Planning-and-Development-Department/Data-Centers

    Primary city resource with counts and a map of operating, under-construction, and proposed projects. It identifies Meta in the High Plains Business Park.

  3. Meta Data Centers

    Building a sustainable future for AI: innovation is transforming data center construction

    February 5, 2026. Accessed August 12, 2026.

    https://datacenters.atmeta.com/2026/02/building-a-sustainable-future-for-ai-innovation-is-transforming-data-center-construction/

    Meta is the project owner. This page describes the company’s construction practices and claims.

    Current company update confirming active construction work at the South Carolina and Wyoming campuses.

Stargate Abilene tracker

  1. OpenAI

    OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites

    September 23, 2025. Accessed August 12, 2026.

    https://openai.com/index/five-new-stargate-sites/

    OpenAI is a principal project partner. Capacity and investment totals are company announcements covering multiple Stargate sites.

    Primary company update describing the operating Abilene flagship and announced sites in New Mexico, Ohio, Texas, and the Midwest. Combined capacity and investment figures must not be treated as site-specific totals.

  2. OpenAI

    Building the compute infrastructure for the Intelligence Age

    April 29, 2026. Accessed August 12, 2026.

    https://openai.com/index/building-the-compute-infrastructure-for-the-intelligence-age/

    OpenAI is a principal user and partner in Stargate. Water and community-benefit statements are the company’s own account.

    Primary company update confirming that the Abilene site is operating on Oracle Cloud Infrastructure.

Microsoft Mount Pleasant campus tracker

  1. Microsoft

    Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin

    June 23, 2026. Accessed August 12, 2026.

    https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/

    Microsoft is the project owner. Investment and employment figures are the company’s own account.

    Primary company update confirming the first facility is operational and a second is under construction.

  2. Microsoft Local

    Mount Pleasant datacenter project update

    July 2026. Accessed August 12, 2026.

    https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/

    Microsoft is the project owner. This is its community construction update.

    Primary project update with current construction activity, truck routes, hours, and a local contact.

Meta Aiken Data Center tracker

  1. South Carolina Department of Commerce

    Meta selects Aiken County for first South Carolina data center

    August 29, 2024. Accessed August 12, 2026.

    https://www.sccommerce.com/ja/node/8034

    State economic-development announcement produced with Meta. Investment, jobs, and opening date are projections.

    Official state announcement identifying the Sage Mill Industrial Park site and expected spring 2027 opening.

  2. Meta Data Centers

    Building a sustainable future for AI: innovation is transforming data center construction

    February 5, 2026. Accessed August 12, 2026.

    https://datacenters.atmeta.com/2026/02/building-a-sustainable-future-for-ai-innovation-is-transforming-data-center-construction/

    Meta is the project owner. This page describes the company’s construction practices and claims.

    Current company update confirming active construction work at the South Carolina and Wyoming campuses.

Google West Memphis campus tracker

  1. Arkansas Economic Development Commission

    Google locating new data center in West Memphis with multi-billion-dollar investment

    October 2, 2025. Accessed August 12, 2026.

    https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment

    State economic-development announcement produced with Google. Investment, employment, energy, and ratepayer claims are the state and company’s account.

    Official state announcement confirming construction, the West Memphis location, site acreage, and announced energy arrangements.

Meta Montgomery Data Center tracker

  1. Meta Data Centers

    Hello, Montgomery!

    May 2, 2024. Accessed August 12, 2026.

    https://datacenters.atmeta.com/2024/05/hello-montgomery/

    Meta is the project owner. Investment, size, employment, energy, and sustainability statements are the company’s own claims.

    Primary company announcement identifying the Montgomery campus and documenting construction activity and planned scale.

Meta Rosemount Data Center tracker

  1. Meta Data Centers

    United States data center locations: Rosemount

    Current location directory checked August 2026. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the project owner. Investment, jobs, and construction milestones are the company’s own account.

    Primary company location directory listing the Rosemount project, its 2024 groundbreaking, and announced investment.

AWS Madison County campuses tracker

  1. Office of the Governor of Mississippi

    Amazon continues Mississippi expansion

    April 9, 2026. Accessed August 12, 2026.

    https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/

    State economic-development announcement produced to promote Amazon’s investment. Investment and job figures are state and company projections.

    Official state announcement identifying an additional Madison County expansion of existing Amazon data center operations.

Meta Tulsa Data Center tracker

  1. Meta

    Breaking ground on a new AI-optimized data center in Tulsa, Oklahoma

    April 21, 2026. Accessed August 12, 2026.

    https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/

    Meta is the project owner. Investment, employment, water, energy, and community-benefit statements are the company’s own claims.

    Primary company announcement confirming the Tulsa groundbreaking and announced project scale.

Stargate Doña Ana County site tracker

  1. OpenAI

    OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites

    September 23, 2025. Accessed August 12, 2026.

    https://openai.com/index/five-new-stargate-sites/

    OpenAI is a principal project partner. Capacity and investment totals are company announcements covering multiple Stargate sites.

    Primary company update describing the operating Abilene flagship and announced sites in New Mexico, Ohio, Texas, and the Midwest. Combined capacity and investment figures must not be treated as site-specific totals.

Stargate Lordstown site tracker

  1. OpenAI

    OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites

    September 23, 2025. Accessed August 12, 2026.

    https://openai.com/index/five-new-stargate-sites/

    OpenAI is a principal project partner. Capacity and investment totals are company announcements covering multiple Stargate sites.

    Primary company update describing the operating Abilene flagship and announced sites in New Mexico, Ohio, Texas, and the Midwest. Combined capacity and investment figures must not be treated as site-specific totals.

Quantum Frederick campus tracker

  1. Maryland Department of the Environment

    Frederick Data Center Sampling and Reports

    Updated through 2026. Accessed August 12, 2026.

    https://mde.maryland.gov/datacenters/Pages/FrederickDataCenter.aspx

    Primary state record identifying the Quantum Frederick site, individual developers, environmental conditions, and permit documents.

  2. Frederick County, Maryland

    Data Centers

    Updated July 2026. Accessed August 12, 2026.

    https://frederickcountymd.gov/9310/Data-Centers

    Primary county hub documenting current construction, the temporary pause on new applications, project maps, road notices, and local concern contacts.

AWS Louisa County campuses tracker

  1. Louisa County, Virginia

    Amazon Web Services announces plan to invest in Louisa County

    August 30, 2023. Accessed August 12, 2026.

    https://louisacounty.gov/m/newsflash/home/detail/446

    County economic-development announcement produced with AWS. Investment, employment, tax, and community-benefit statements are county and company projections.

    Official county announcement identifying two planned AWS campuses and the county technology overlay district.

  2. Louisa County, Virginia

    Data Centers

    Current county information hub. Accessed August 12, 2026.

    https://www.louisacounty.gov/3258/Data-Centers

    Primary county hub linking its detailed guide, which identifies the two AWS campuses as underway and publishes parcel maps, construction information, public-input paths, and water, power, noise, traffic, and tax details.

Meta El Paso Data Center tracker

  1. Meta

    Meta announces new strategic venture with BlackRock to develop data center in El Paso

    July 28, 2026. Accessed August 12, 2026.

    https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/

    Meta is the project owner and initial sole occupant. Investment, capacity, employment, and schedule statements are the company’s own account.

    Primary current company update confirming construction, announced capacity, financing structure, and target for bringing capacity online.

Google Armstrong County location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Cedar Rapids location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Central Ohio campuses tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Chesterfield County location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Council Bluffs Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Dorchester County location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Douglas County Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Ellis County Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Haskell County location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Henderson Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Hermantown location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Indiana data center location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Jackson County Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Kansas City location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google LaGrange location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Lenoir Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Lincoln location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Mayes County Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Mesa location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Michigan City location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Midlothian Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Montgomery County Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Muskogee County location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google New Florence location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Northern Virginia data centers tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Omaha Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Pampa location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Papillion Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Pine Island location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Red Oak Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Stillwater location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Storey County Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google The Dalles Data Center tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Lowcountry data center location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Google Wilbarger County location tracker

  1. Google Data Centers

    Data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.google/locations/

    Google is the operator. Location and development-stage labels are Google’s own directory records, not independent permit verification.

    Official operator directory. Entries marked in development are kept at that broad stage until local records establish whether a project is proposed, permitting, or under construction.

Meta Huntsville Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Mesa Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Stanton Springs Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Kuna Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta DeKalb Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Jeffersonville Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Altoona Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Kansas City Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Sarpy Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Los Lunas Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Forest City Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Bowling Green Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta New Albany Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Prineville Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Gallatin Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Fort Worth Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Temple Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Eagle Mountain Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Henrico Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.

Meta Beaver Dam Data Center tracker

  1. Meta Data Centers

    United States data center locations

    Current operator directory. Accessed August 12, 2026.

    https://datacenters.atmeta.com/us-locations/

    Meta is the operator. Investment, employment, and milestone figures are company claims and have not yet been checked against local records for these directory leads.

    Official operator directory with location cards, announced investment, break-ground year, and company employment estimates.