Cooling with water saves electricity. Cooling without water uses more of it. So the water answer and the power answer move together.

What it is, in plain words

Heat has to go somewhere. Broadly there are two ways to move it out of the building. Evaporative cooling uses water, and evaporating water is very efficient, so it uses less electricity. Closed-loop and air-cooled systems recirculate a coolant instead, so they use much less water and more electricity.

That’s the trade-off, and it’s why “we use almost no water” and “we’re a large electrical load” tend to show up in the same project. Neither claim is a lie. They’re two ends of the same design decision.

What the evidence actually shows

For Carroll County specifically, there is no published gallons-per-day figure. What exists is the developer’s own commitment. In the agreement announced with the City of Carrollton in late July 2026, the developer pledged a closed-loop coolant system. The reporting describes it as requiring minimal water.[2] That number is not quantified in the source, and it comes from the developer, not from a regulator or an independent study.

There is a state-level hook worth knowing about. The executive order signed August 6, 2026 directs the Energy and Environment Cabinet to deny certain permits. The list covers projects that would negatively affect water use, water quality, water supply, federal jurisdictional wetlands, or natural resources.[3] That puts water in front of a state agency with a permit decision, which is a place where evidence can be filed.

What’s contested or unknown

“Closed loop” isn’t a single defined thing with one water number attached to it. Ask what it means in this specific design, because that’s where the answer lives, not in the phrase.

Also unknown for Carroll County: where the water would come from, and where the discharge would go. The reporting places the Carrollton site next to Carrollton Utilities’ regional wastewater treatment plant, with the Kentucky River on the north edge of the property.[2] That makes both questions concrete and answerable. They just haven’t been answered publicly yet.

Questions worth asking at a hearing

Sources for this page

  1. Congressional Research Servicenot verified

    Report R48646, on data center resource use

    2025. Accessed August 6, 2026.

    https://www.congress.gov/crs-product/R48646

    Nonpartisan research arm of Congress. The full text returned HTTP 403 in our source pass. The water figures on this site come from a search synthesis that credits this report and others, not from a direct read.

  2. Carroll News-Democrat / Madison Courier (Paxton Media Group)

    Carrollton reaches agreement for $9.6B data center

    July 29, 2026. Accessed August 6, 2026.

    https://www.madisoncourier.com/carroll_news_democrat/news/carrollton-reaches-agreement-for-9-6b-data-center/article_f616dd07-b3b7-53dd-a9e8-4824c9263043.html

    Local newspaper. The only outlet reporting several Carroll County details on this site. Paxton Media Group owns both mastheads, so a second Paxton article is not an independent confirmation.

  3. WKYU (public radio, Bowling Green)

    Kentucky Gov. Beshear to require data centers prove no impact on ratepayers

    August 6, 2026. Accessed August 6, 2026.

    https://www.wkyufm.org/2026-08-06/kentucky-gov-beshear-to-require-data-centers-prove-no-impact-on-ratepayers

    Public radio. Loaded directly. Primary source used for the executive order’s provisions.