Minnesota project record
Meta Rosemount Data Center
Meta lists a 2024 groundbreaking in Rosemount; an operational milestone still needs direct confirmation.
← Back to the national tracker · Show this project on the map
- Location
- Rosemount, Minnesota
- County
- Dakota County
- Map point
- Rosemount areaApproximate locality; not a parcel boundary.
- Stage
- Under construction / opening pending
- Evidence checked
- Operator
- Meta
- Developer
- Meta
Current snapshot
Meta’s current U.S. location directory lists the Rosemount campus and a 2024 groundbreaking. The city previously described supporting transmission and water-line work, but this record does not treat an announced completion target as proof that operations have begun.[1]
Documented scale
What to watch next
- Certificate of occupancy and a direct operational announcement.
- Xcel Energy dockets for transmission work, load, and cost allocation.
- Measured water, noise, traffic, and tax records after operations begin.
What this record means
This page is a dated evidence snapshot. It does not mean every approval is complete, and it does not predict whether the project will be built as announced. Follow the sources below, then confirm current deadlines with the local government, state permitting agency, and utility regulator.
Have a project that is not listed? Use the national tracking workflow to find the public record.