Questions to ask about a proposed data center
How to use this list
Pick the two or three that matter most to you. Make each one about your own road, well or house. Ask for the answer in writing. A question that works for both supporters and opponents is a good question.
The basics
- Who is the applicant, and who will own and run the building?
- What exactly is being asked for: rezoning, a permit, a site plan, annexation?
- How many buildings and how many megawatts, at first and at full build?
- What other approvals does the project still need, and from whom?
- Where can I read the full application and the staff report?
Noise
- Is there a sound study, and may I have a copy?
- What sound level is predicted at the nearest home at night, at full load?
- Does the study cover low-frequency sound?
- Is the sound limit a written condition of approval? Who measures it, and what is the penalty?
- When are the backup generators tested, and for how long?
Water
- How many gallons of water a day, on average and on the hottest day?
- Where does the water come from, and is there a cap in the service agreement?
- Where does the wastewater go?
- Who pays for new water or sewer lines?
Power and bills
- Which utility will serve the site, and with how many megawatts?
- Is there a special rate or contract for this customer, and has the utility commission approved it?
- Who pays for new lines, substations or power plants if the project is delayed or cancelled?
- How many backup generators, what fuel, and which air permit covers them?
Traffic
- Is there a traffic study that covers the construction years?
- What is the haul route, and is it written into the approval?
- What hours may trucks run? Are school hours excluded?
- Who repairs the roads afterward, and is there a bond?
Taxes and jobs
- Which taxes are reduced, by how much, and for how many years?
- What will the school district receive each year, and is it guaranteed?
- How many permanent jobs are required, and by what date?
- Is there a clawback if the jobs or investment do not arrive?
- Were the revenue and job numbers checked by anyone independent?
The land
- How far will the nearest building and equipment be from the nearest home?
- What berm, trees or wall is required, and how tall?
- What are the limits on lighting at night?
- How will stormwater be handled, and who inspects it?
Enforcement and the end
- For each promise, where is it written and who enforces it?
- What happens if a condition is broken? What is the penalty?
- Do the conditions still apply if the site is sold?
- If the project is never finished or closes, who removes the buildings? Is there a bond?