North Carolina project record
Amazon Energy Way Tech Campus
A major Amazon campus with active construction-related work and air permits for temporary bridge power and permanent emergency generation.
← Back to the national tracker · Show this project on the map
- Location
- Hamlet, North Carolina
- County
- Richmond County
- Map point
- Hamlet areaApproximate locality; not a parcel boundary.
- Stage
- Construction / air permitting
- Evidence checked
- Operator
- Amazon Data Services
- Developer
- Amazon Data Services
Current snapshot
North Carolina held a joint public hearing on July 30, 2026. The comment window closed July 31; this tracker has not confirmed the final permit decision. The state says the campus would use temporary Duke Energy engines until grid service is available, plus Amazon emergency generators that remain onsite.[1][2]
Documented scale
What to watch next
- The final decisions and conditions on both Title V air permits.
- The timeline for permanent grid service and retirement of bridge-power engines.
- Construction traffic, emergency-response, water, and local incentive agreements.
What this record means
This page is a dated evidence snapshot. It does not mean every approval is complete, and it does not predict whether the project will be built as announced. Follow the sources below, then confirm current deadlines with the local government, state permitting agency, and utility regulator.
Have a project that is not listed? Use the national tracking workflow to find the public record.